News

Sylex

All News

Sort by:   All News l  Interconnections  l  Sensors and Sensings Systems

 

 

14.10.2016 | Interconnections Sylex
Date: 8 November 2016
Location: Munich, Germany
Participation: Visitors
Attendants: Juraj Šarišský and Eduard Koza
Schedule your meeting with our colleagues and we look forward to seeing you during this event.
READ MORE
27.09.2016 | Interconnections | New product Shuffle Cross-Connect
Solution for high fiber density and complex fiber routing challenges at on-board and card design & architecture.
READ MORE
15.08.2016 | Interconnections ECOC 2016 Düsseldorf
Date: 19–21 September 2016
Location: Düsseldorf, Germany
Participation: Exhibitor
Attendants: Juraj Šarišský, Michal Goliaš, Tomáš Rudnický, Jozef Pavlov and Eduard Koza
Schedule your meeting with our colleagues and we look forward to seeing you during this event.
READ MORE
22.07.2016 | Company | Sylex news
You may have heard about CPR in recent days; herewith we’d like to explain in a condensed form what CPR is and how this regulation impacts businesses with cable products.
READ MORE
06.05.2016 | Interconnections | New product
When it is necessary to install a simple but long single-trunk cable with an MTP connector terminated on a micro-core cable, the question of how to pull it through the cable ducts needs to be solved. Thin 12- or 24-fibre cables without a central strength element (FRP) are not suitable for a pulling type of installation. However, this can be solved by using so-called double-jacket cables, which have one additional layer of aramid yarn and a second outer jacket. An additional layer of aramid yarn can also be used for pulling purposes.
READ MORE
21.04.2016 | Sensors & Sensing systems
Date: 7-9 June 2016
Location: Poppi, Italy
Participation: Exhibitor and presenter during New Trends is Contact Monitoring session
Attendants: Peter Lowy and Gabor Patassy
Schedule your meeting with our colleagues and we look forward to seeing you during this event.
READ MORE
11.04.2016 | Interconnections | New product New products based on PRIZM MT lensed ferrules and MXC connectors
We are proud to announce that Sylex has passed the certification programme of the company US Conec for expanded beam PRIZM® MT ferrule terminations.
READ MORE
19.02.2016 | Interconnections | New product FASTLINK system
SYLEX is offering a renewed FASTLINK system, bringing a number of new features to make installation easier and faster. The FASTLINK system consists of pre-terminated cables with 6, 12 or 24 fibers and tailor-made patch panels.
READ MORE
19.02.2016 | Interconnections | New product POP-UP reels
Sylex is pleased to introduce the new POP-UP reels, featuring quick and easy disassembly after use. With this feature, you can easily reduce the final volume of packaging waste by 88%. POP-UP reels are available in two sizes: size I for light cables with small outer diameters, and size II for heavier cables with higher outer diameters and larger bending radius.
READ MORE
19.02.2016 | Interconnections | New product CORPULL – An innovative approach for installing fiber-optic assemblies
The new pulling system from Sylex will conserve the most valuable assets of every installation company: time and money. With a totally different point of view on the deployment process of pulling pre-terminated assemblies, you can increase the speed of installation and avoid unnecessary expenditures.
READ MORE
Displaying results ###SPAN_BEGIN###%s to %s out of ###SPAN_BEGIN###%s
<< First < Previous 1 2 3 4 5 Next > Last >>